KC/RR/2026-027 8 Apr 2026, Contractor
The 12-day delay in March was caused by heavy rain, not by insufficient labour.
TimeCost reads a project's contract, correspondence and site records. It builds the chronology, then marks up the record the way a reviewer would: what corroborates a statement, what contradicts it, and what it relies on that nobody produced. Your consultants make every call.
Δ1 Potential conflict on responsibility: rain (KC) against labour (RD). Consultant review required.
✓ Submission on 12.01 corroborated by the progress report, p.1
Nothing is typed in by hand. Every line in every register opens the page it came from.
Every letter with its reference, date, subject, what it is doing, and the letters it answers. Threads form from the references.
What happened, its effect and the remedy asked for, kept apart. Four dates per event: occurrence, awareness, notice, effect, each known, unknown or disputed, with the reason.
Each assertion against the records that corroborate it (another party or a site record, same place, same date), merely relate to it, or restate it.
Records about the same place that disagree on cause, status, dates or figures. Quoted side by side. Never decided.
Appendices, drawings, programme revisions, reports and earlier letters the record names but the file does not hold.
Your narrative, sentence by sentence: source linked but unverified, needs review, or no source. Citations export as numbered references.
Captured from the product, not drawn for this page.








A synthetic corpus of 5,000 letters with contradictions and decoys planted in it, scored on a seed the rules were never tuned on.
| Test | Planted | Result | Note |
|---|---|---|---|
| Planted contradictions, five kinds | 100 | 100 found | Each with the right kind |
| Look-alike decoys at other places | 100 | 0 flagged | Same wording, different pier |
| Enclosure types never uploaded | 97 | 97 listed missing | 4,247 mentions, all found |
| Letters analysed | 4,900 | 56 s | One laptop, no cloud |
Synthetic letters are cleaner than real ones. Accuracy on your own projects is what a pilot measures: every finding in the product can be marked right or wrong, and the product reports the rate.
KC/RR/2026-027 8 Apr 2026, Contractor
The 12-day delay in March was caused by heavy rain, not by insufficient labour.
RD/PC/2026-071 20 Mar 2026, Employer
Our review also identified 12 days of delay to Block A concrete pours in March due to insufficient site labour.
Listed as a potential conflict on responsibility, both letters quoted word for word. The official weather record the contractor relies on is named but not in the file, so it is listed as referenced but not located. Which letter is right stays your call.
The sample project opens in the browser. Nothing to install.
Open the sample project